【Report】Kuwadani ELIS Power Plant in Tsuyama City -(1) Control Panel Foundation Work-

2018/10/27

Our power plant is located at the entrance of Kuroki No. 1 Campsite.(Figure 1)
1
Figure 1 Location map

Here is an enlarged view.(Figure 2)
2
Figure 2 Enlarged view

The generated electricity will be used as a power source for the EV used to move the manager inside the campground.

Can be used as a backup power source in the event of a disaster.

Since there is no engine noise from gasoline-powered vehicles when using EVs, children do not have to worry about waking up when patrolling at night.

On Saturday, October 20, last week, ground maintenance was carried out on the foundation mounting part of the control panel, and protective piping was buried to protect the wiring from the turbine to the control panel. (Photo 1-7)

3
Photo 1

4
Photo 2

5
Photo 3

6
Photo 4

7
Photo 5

8
Photo 6

9
Photo 7

Two days later, on October 22nd (Monday), concrete was poured into the frame of the foundation of the constructed control panel. (Photo 8-10)

10
Photo 8

11
Photo 9

12
Photo 10