Use of park lightning

Issues before installation

There were very few places where water rights could be obtained.

Installation purpose

The generated electricity will be used for lighting, and the environmental policy of Miyoshi City will be promoted inside and outside the "Enokawa Canoe Park" where local residents gather.

Benefits of Introduction

We were able to publicize the environmental policy suitable for Miyoshi City, which has abundant water resources.

Overview

Place of installation:  Canoe Park in Miyoshi City, Hiroshima Prefecture
Waterwheel: Open type overhang water turbine
Shape: Diameter 0.9m
Width  2.2m
Maximum flow: 50ℓ/s
Rated power output: 0.3528kW
Crop start period: 2009 Winter