Issues before installation
There were very few places where water rights could be obtained.
Installation purpose
The generated electricity will be used for lighting, and the environmental policy of Miyoshi City will be promoted inside and outside the "Enokawa Canoe Park" where local residents gather.
Benefits of Introduction
We were able to publicize the environmental policy suitable for Miyoshi City, which has abundant water resources.
Overview
Place of installation: | Canoe Park in Miyoshi City, Hiroshima Prefecture |
---|---|
Waterwheel: | Open type overhang water turbine |
Shape: | Diameter 0.9m Width 2.2m |
Maximum flow: | 50ℓ/s |
Rated power output: | 0.3528kW |
Crop start period: | 2009 Winter |